United States Air Force
Air Force Center for Environmental Excellence
Pease Air Force Base |
Construction
Rubble Dump (CRD-1) Landfill Cap
|
Prime Contractor:
Bechtel Environmental, Inc.
Pease International Tradeport
20 Short Street
Portsmouth, NH 03801
Contact:
David Watson, PE
Project Manager
Phone: (702) 295-2903
Martin Mistretta
Site Manager
Phone: (603) 334-6430
|

CRD-1 Prior to Landfill Remediation

CRD-1 After Landfill Remediation |
Subcontractor:
Hong Environmental , Inc.
Jenny Hong
Paul Runions
Robert Levesque
Henry Mellynchuk
Edwin Warner |
Principal/President
Project Quality Control
Senior Project Manager
Health and Safety Officer/Site Supervisor
Site Foreman |
Construction Rubble Dumpsite - CRD-1
Scope of WorkThe
site was a former sand and gravel borrow pit, and construction
rubble dump approximately
435,000 square feet in area. The specific design called for the removal (cut) of
material from the western side for placement (fill) towards the center of the site.
Calculations showed that there was 21,965 cubic yards of material cut and 52,618 cubic
yards needed for fill. A low-permeability soil/vegetative cap was then installed.
The site was first selectively cleared then surveyed to provide control
points. An access road and temporary erosion control structures were constructed. The
erosion control structures included a sedimentation basin and runoff diversion swales.
Cutting and filling then took place to provide positive drainage
across the site. The entire area was graded and capped with
a clayey soil layer. Restoration and stabilization of the
site was accomplished by placing a layer of topsoil over the clay
material and seeding with native grasses.
Continue |
|